Pre-Shipment Inspection Before Paying the Balance

A pre-shipment inspection is the cheapest insurance in an import cycle. It works only if you brief it properly and book it early enough.

Send your requirement

What a pre-shipment inspection is, and what it is not

A PSI is a sample-based verification against your specification, carried out on finished, packed goods before the balance payment and before loading. It is not a factory audit (it looks at product, not systems) and it is not a guarantee of every can in the container. Its purpose is to give you evidence before the money moves and to catch systematic problems while there is still time to fix them.

Book it on the right day

Goods must be finished, packed and labelled, with at least 80% in cartons and the balance available for sampling. Book the agency at least five to seven days ahead and give the factory three to five days' notice. An inspection squeezed in on the loading day produces findings no one can act on.

Brief the agency with a document, not a phone call

Send your specification, the sampling plan (AQL 2.5 for major and 4.0 for minor defects is a common default), the critical-defect list, the label artwork and the packing configuration. The single biggest cause of a useless report is an inspector working from the supplier's product description instead of the buyer's specification.

Canned-food specifics worth naming in the brief

Who pays, and how we host it

The buyer appoints and pays the agency; the supplier provides access, samples and documentation. Ask for the report before the balance is released, not in parallel with it — the sequence is the whole point of the exercise.

When the inspection fails

Do not release the balance. Ask for the retaining sample to be sealed, the failure documented with photographs and the batch number, and then put the choice in writing: rework and re-inspection on a new date, replacement of the affected batch, or a credit against the invoice. The remedy should already exist in your purchase order — if the inspection clause is written before the order, this conversation takes a day instead of a month.

Keep the two gates separate

The deposit gate verifies the supplier. The balance gate verifies the goods. Buyers who run the second gate as a formality lose the protection they paid for, and buyers who add the second gate after a first order learn why it exists.

What Kingstar can show you

Put this on your next order